Palm Beach Solid Waste Facility | Boynton Beach, FL
Industrial
Project Details:
CWI was contracted by site-work contractor BCM Construction to provide the following Surveying and Construction Layout services on the Palm Beach Solid Waste FCC Facility:
- Calculations
- Verify Boundary Controls & Vertical Control/ Set Benchmarks
- Stakeout Machine Control
- Stakeout Building Pad
- Stakeout Subgrade
- Stakeout Finish Curbing & Bluetops
- Stakeout Storm Drainage
- Asbuilt Storm Drainage
- Stakeout Sanitary Sewer
- Asbuilt Sanitary Sewer
- Stakeout Water Distribution
- Asbuilt Water Distribution
- Rock OR Paving Asbuilts
- Stakeout Lakes/Retention Areas
- Asbuilt Lakes/Retention Areas
- Prints/Mylars
Principal In Charge: David P. Lindley, PLS
Project Manager: Raymond Dowling
Acres: 10.02
Project Firms:
- Contractor: BCM Construction
- Engineer: Michael Baker, International
- Owner: FCC Environmental Services
- Surveyor: Caulfield & Wheeler, Inc.