Project Details:

CWI was contracted by site-work contractor BCM Construction to provide the following Surveying and Construction Layout services on the Palm Beach Solid Waste FCC Facility:

  • Calculations
  • Verify Boundary Controls & Vertical Control/ Set Benchmarks
  • Stakeout Machine Control
  • Stakeout Building Pad
  • Stakeout Subgrade
  • Stakeout Finish Curbing & Bluetops
  • Stakeout Storm Drainage
  • Asbuilt Storm Drainage
  • Stakeout Sanitary Sewer
  • Asbuilt Sanitary Sewer
  • Stakeout Water Distribution
  • Asbuilt Water Distribution
  • Rock OR Paving Asbuilts
  • Stakeout Lakes/Retention Areas
  • Asbuilt Lakes/Retention Areas
  • Prints/Mylars

Principal In Charge: David P. Lindley, PLS
Project Manager: Raymond Dowling
Acres: 10.02

Photographs:

2022-03-18-9583-PalmBeachSolidWasteFacility-17
2022-03-18-9583-PalmBeachSolidWasteFacility-18
2022-03-18-9583-PalmBeachSolidWasteFacility-05
2022-03-18-9583-PalmBeachSolidWasteFacility-15
2022-03-18-9583-PalmBeachSolidWasteFacility-41
2022-03-18-9583-PalmBeachSolidWasteFacility-13