Project Details:

Under a Continuing Services Contract with Chen Moore & Associates, CWI provided Professional Surveying and Mapping Services in support of a major pipeline project for the Seacoast Utility Authority (SUA).

The project spanned the south side of PGA Boulevard in Palm Beach Gardens, stretching from just west of I-95 to west of Alternate A1A, where CWI’s work played a key role in the pipeline’s design and planning.

As part of the scope, CWI conducted a Specific Purpose Topographic Survey that included right-of-way lines, existing easements, above-ground features, visible pipe data at manholes and inlets, and spot elevations at 50-foot intervals.  The survey limits extended from the roadway median to 10 feet beyond the right-of-way and included an adjacent structure.

To support accuracy and detail, CWI also performed high-definition scanning across the site, capturing manholes, elevations, and control monuments, while integrating utility markings from previous scans and all relevant plats.

Services:

Caulfield & Wheeler, Inc. provided the following services:

  • Boundary Survey
  • Specific Purpose Topographic Survey
  • High Definition Scanning